Middle East G Mark Low Voltage

g mark low coltage

The Middle East G Mark Low Voltage Certification is a mandatory compliance mark for electrical products entering GCC countries. Regulated by the Gulf Standardization Organization (GSO), it confirms safety and conformity with Gulf Technical Regulations. This certification ensures product reliability, consumer protection, and smooth market access across Saudi Arabia, UAE, Kuwait, Qatar, Oman, and Bahrain.

What is Middle East G Mark Low Voltage?

The G Mark for Low Voltage Electrical Equipment is a Gulf Conformity Mark required for products operating within specified voltage ranges. It is regulated under the GSO Technical Regulation BD-142004-01 to ensure product safety and performance. Manufacturers, importers, and distributors must obtain this certification before selling in the GCC region. The G Mark assures consumers that the product has been tested, approved, and complies with Gulf safety standards, making it essential for smooth trade and market acceptance.

Who Can Apply for Middle East G Mark Low Voltage?

  • Manufacturers of low voltage electrical products
  • Importers bringing electrical equipment into GCC markets
  • Authorized representatives of foreign manufacturers
  • Distributors ensuring compliance for product sales

Documents Required for G Mark Low Voltage Application

  • Product Test Reports (IEC/EN standards)
  • Technical Documentation (designs, risk analysis, specifications)
  • Declaration of Conformity (DoC)
  • User Manuals & Product Labeling (Arabic & English)
  • Quality Management System (if applicable)
  • Factory Audit Report (for high-risk products)

Process to Apply for G Mark Low Voltage Certification

  • Identify applicable GSO standards for the product.
  • Conduct testing in an accredited laboratory.
  • Prepare technical file and supporting documents.
  • Apply through a GSO-recognized Notified Body.
  • Undergo product evaluation and factory audit (if required).
  • Receive certification and affix the G Mark label.

Products Covered in Middle East G Mark Low Voltage

  • Household appliances (refrigerators, washing machines, AC units)
  • Lighting systems & luminaires
  • Audio-video and IT equipment
  • Power supply units & adapters
  • Electrical cables and components
  • Communication devices

Timeline

  1. Product Testing & Documentation: 3–5 weeks
  2. Application Review & Evaluation: 2–3 weeks
  3. Total Certification Timeline: Around 6–8 weeks, depending on product category and complexity.